Residential ProjectsVersailles Parc Addition (Hurst)Macatee Engineering performed design services for this 49-lot single-family subdivision located on 16.13-acres in Hurst. Design included lot grading, paving, drainage area map, storm sewer, water and sanitary sewer, water main improvement, and erosion control. Development Cost: $1,100,000 Summit Senior Village (Gainesville)
Macatee Engineering performed design services for this senior living development on 7.35-acres in the Pecan Creek area of Gainesville. the development contains 19 4-plex units plus a leasing office/clubhouse. Macatee Engineering prepared a flood study for the development and a Letter of Map Revision (LOMR) from FEMA due to the 100-year flood plain elevations around Pecan Creek. Design included mass grading, borrow area grading, paving, dimensional control, drainage area map, drainage calculations, water and watsewater, and erosion control.
Development Cost: $375,000
Lost Creek Estates Addition (Talty)
Macatee Engineering performed design services for this 125-acre subdivision development in Talty, close to Terrell, Texas. The 67-lot development with one-acre lot minimums required permitting through the Texas Department of Transportation for a road connection to FM 148. Design included site layout and platting, mass grading, lot grading, drainage area map with ditch and culvert calculations, paving and erosion control.
Development Cost: $1,500,000
Havencreek Court (Dallas)Macatee Engineering designed paving and utility improvements in a 9-lot subdivision in this 2.8-acre single-family tract. Design included grading, paving, water and sanitary sewer. Surveying services included performing boundary and topographic surveys; preparing preliminary and final plats, and providing construction staking.
Exall Park Area (Dallas)Macatee Engineering designed the paving, drainage and utility improvements for five different townhouse developments totaling 101 lots in the Exall Park area just north of downtown Dallas. Design included grading, storm drainage, paving, water and sanitary sewer. Surveying services included performing boundary and topographic surveys; and providing construction staking. Construction Cost: $500,000 Haskell Johnston Addition (Dallas)Macatee Engineering designed the grading, drainage, and utility improvements for this 8-lot townhouse development close to downtown Dallas. Design included grading, water and sanitary sewer, paving, drainage and erosion control. Construction Cost: $80,000 Mallard Reserve (Rowlett)Macatee Engineering designed 15 half-acre lots plus 3 common areas on this 7.74-acre single-family residential development site near the west bank of Lake Ray Hubbard in Rockwall County. Design included grading, water, sanitary sewer and drainage improvements, a lot grading plan, an erosion control plan and design of a lift station to serve a 200-acre drainage basin. Surveying services were performed by others on this project. Macatee Engineering assisted in preparing a facilities agreement between the developer and the city. Construction Cost: $1,400,000 Prairie Creek North (5 Phases) (Dallas)Macatee Engineering has completed design of 267 lots on 80.5 acres of this 439-lot, 133-acre multi-phased, single-family residential project in Dallas. Design included grading, water, sanitary sewer and drainage improvements, a lot grading plan and an erosion control plan. Surveying services included performing boundary and topographic surveys; preparing preliminary and final plats; providing construction staking; and preparing easement documents. Construction Cost - Phase 1: $1,000,000 Shores of Eastern Hills No. 4, 5 & 6 (Garland)Macatee Engineering designed paving, drainage and utility improvements in a 177-lot subdivision on this 70-plus acre single-family tract. Design included grading, storm drainage, paving, water and sanitary sewer. Surveying services included performing boundary and topographic surveys; preparing preliminary and final plats; providing construction staking; and preparing easement documents. Construction Cost: $3,000,000 Victorian Forest Estates (Dallas)Macatee Engineering designed paving, drainage and utility improvements in a 93-lot subdivision in this 25-acre single-family tract. Design included grading, storm drainage, paving, water and sanitary sewer. Surveying services included performing boundary and topographic surveys; preparing preliminary and final plats; providing construction staking; and preparing easement documents. Macatee Engineering obtained a LOMA from FEMA for this development. Construction Cost: $1,500,000 Enclave at Grove Hill (Dallas)Macatee Engineering designed paving, drainage and utility improvements in a 194-lot subdivision on this 48.9-acre single-family tract. Design included grading, storm drainage, paving, water, and sanitary sewer. Surveying services included performing boundary and topographic surveys; preparing preliminary and final plats; providing construction staking; and preparing easement documents. Construction Cost: $3,200,000 Enclave at Wooded Creek (Dallas)Macatee Engineering designed paving, drainage and utility improvements in a 138-lot single-family subdivision. Design included grading, storm drainage, paving, water and sanitary sewer. Surveying services included performing boundary and topographic surveys; preparing preliminary and final plats; providing construction staking; and preparing easement documents. Macatee Engineering obtained a LOMA from FEMA for this development. Construction Cost: $2,000,000 Prairie Creek Estates No. 1 & 2 (Dallas)Macatee Engineering designed 113 lots on this 30.2-acre single-family residential development site. Design included grading, water, sanitary sewer and drainage improvements, a lot grading plan and an erosion control plan. Surveying services included performing boundary and topographic surveys; preparing preliminary and final plats; providing construction staking; and preparing easement documents. Macatee Engineering obtained a LOMA from FEMA for this development. Construction Cost: $1,400,000 BUZZ Lofts (Dallas)Macatee Engineering designed the paving, drainage, and utility improvements for this 49-lot townhouse development in the Cedars TIF District to the south of downtown Dallas. Design included grading, storm drainage, paving, water and sanitary sewer. Macatee Engineering provided civil drawings for inclusion in City TIF submittals for this particular planned district. Construction Cost: $150,000 Southridge & Stonecrest Additions,Valley Ranch (Irving)
Macatee Engineering designed paving, drainage, and utility improvements for three single-family subdivisions totaling 158 lots. Design included grading, water, sanitary sewer and drainage improvements, a lot grading plan and an erosion control plan. Surveying services included performing boundary and topographic surveys; preparing preliminary and final plats; providing construction staking; and preparing easement documents.
Construction Cost: $2,400,000 Enclave at Wyrick Estates (Dallas)
Macatee Engineering designed 134 lots and 4 landscaped common areas on this 31-acre single-family residential development site. Design included grading, water, sanitary sewer and drainage improvements, turn lane construction design coordinated with Texas Department of Transportation (Spur 244), a lot grading plan and an erosion control plan. Surveying services included performing boundary and topographic surveys; preparing preliminary and final plats; providing construction staking; and preparing easement documents.
Construction Cost: $2,400,000 Trinity Forest Estates (Dallas)
Macatee Engineering designed 125 lots on this 50-acre single-family residential development site. Design included grading, water, sanitary sewer and drainage improvements, a lot grading plan and an erosion control plan. In addition, a LOMR was obtained from FEMA for the development. Surveying services included performing boundary and topographic surveys; preparing preliminary and final plats; providing construction staking; and preparing easement documents.
Construction Cost: $1,800,000
Magnolia Hill (Dallas)Macatee Engineering designed the paving, drainage and utility improvements in a 20-lot loft townhouse development. Design included grading, storm drainage, paving, water and sanitary sewer.
Construction Cost: $200,000
Avalon Addition, Lower Greenville (Dallas)Macatee Engineering designed and performed construction management for paving, drainage and utility improvements in a 22-lot single-family townhouse subdivision. Design included grading, storm drainage, paving, water and sanitary sewer. Surveying services included performing boundary and topographic surveys; preparing preliminary and final plats; providing construction staking; and preparing easement documents.
Construction Cost: $150,000
Enclave @ White Rock (Dallas)Macatee Engineering designed paving, drainage, and utility improvements for an 86-lot single-family subdivision. Design included grading, water, sanitary sewer and drainage improvements, a lot grading plan and an erosion control plan. Surveying services included performing boundary and topographic surveys; preparing preliminary and final plats; providing construction staking; and preparing easement documents.
Construction Cost: $1,200,000
Enclave @ Ash Creek (Dallas)Macatee Engineering designed paving, drainage, and utility improvements for an 84-lot single-family subdivision. Design included grading, water, sanitary sewer and drainage improvements, a lot grading plan and an erosion control plan. Surveying services included performing boundary and topographic surveys; preparing preliminary and final plats; providing construction staking; and preparing easement documents.
Construction Cost: $600,000 Grand Traditions at Stonebridge Ranch (McKinney)Macatee Engineering performed platting and design for this 77-lot single-family residential development. Design included plans for water, sanitary sewer, paving and drainage improvements as well as preparation of a lot grading plan and erosion control plan. Surveying services included performing boundary and topographic surveys; preparing preliminary and final plats; providing construction staking; and preparing easement documents.
Construction Cost: $900,000
Willow Pond Addition (Frisco)Macatee Engineering designed 171 lots plus 4 lakes and common areas on this 43-acre single-family residential development site. Design included grading, onsite water and sanitary sewer, paving, erosion control, and lakes, dam and emergency overflow plans. A 100 ft.-wide collector road approximately 5000 ft. long was also designed including drainage, water, wastewater and paving improvements. Construction Cost: $2,500,000 | ||